Downtime Is a Bad Target for Improvement
Here's a scenario that should bother anyone running an improvement program.
Suppose you walk into a plant and find a way to nearly double a machine's run rate. As a result, production almost doubles! That's great, right?
But then you check the downtime report.
Downtime increased. The number of stops increased.
This is a real problem. There are companies that tie maintenance leaders' bonuses to downtime goals, which incentivizes the wrong stuff.
Suppose I look at the setup on a machine that's running very slow, and I solve that issue allowing the machine to go back to rated speed. Pure gain?
Nope. All that slow running wasn't downtime, but when I speed it up I compress my runtime.
If everything stays the same except run speed, I now have to do more changeovers, which always come with downtime.
And your number of stops - if you stop every 30 units and you run twice as fast, you don't just get more downtime, you get more stops too.
Because you are running more jobs and more product.
So now I have more stops per hour, more downtime minutes, and far more good product produced.
By the downtime metrics, I made things worse. By any business measure, I made things much better.
This isn't a one-off.
Lots of real fixes make downtime go up or create competing results:
-Speeding up a machine that was cruising, it runs harder and shows stops that were hidden before. (NOTE: I'm not telling you to turn your equipment wide open without fixing it first. I've written articles explaining why that's a bad idea.).
-Run faster, and every count-based stop comes around sooner (changeovers and mechanical stops).
-Improved production can cause shorter batches to match demand and changeovers become more frequent.
When a metric can move the wrong way while the business gets better, it's a bad target. Teams chasing such a target will avoid good changes and sometimes make bad ones.
The easiest way to hit downtime targets is to reduce machine speed unnecessarily because slowing down machines ALWAYS reduces downtime.
Do you want your technical team to prioritize this fix?
The rule I use: the closer a metric sits to the real goal, the more honestly it measures improvement. Measure the outcomes:
Defect rate going down
Good output per scheduled hour going up
Profitable productivity going up
Downtime is still useful for finding problems. It's a great flashlight and you should be monitoring it to understand your problems.
It's just a terrible scoreboard.
What metric have you seen push a team in the wrong direction?






Comments